Trending...
- 'Reflections: Enlightening Insights Into the Divine Mystery' — The Latest Book by Philosopher Steven Colborne - 140
- $620 Million in Recent Government Contract Awards with More Than $1.2 Billion in Annualized Revenue: Circle8 Group (N A S D A Q: CIRC) - 139
- $40 Billion Global Market Value by 2030 Projected in Unmanned Aerial Vehicle or Other Drone Technology Sector, Growing at 9.2% Compound Annual Growth - 116
Contact: Nick Schirripa, MDOT Office of Communications, 269-208-7829 Agency: Transportation
COUNTY:
Kalamazoo
HIGHWAY:
I-94 Business Loop (BL) (Michigan Avenue)
CLOSEST CITY:
Kalamazoo
START DATE:
Monday, Aug. 2, 2021
ESTIMATED END DATE:
Friday, Sept. 17, 2021
PROJECT:
The Michigan Department of Transportation (MDOT) will be repairing the I-94 BL bridge over Portage Creek. The $412,000 investment includes concrete end block replacement, deck patching, substructure repair, joint replacement, new guardrails, and approach work.
More on Michimich.com
Crews will return in late October to perform an epoxy overlay on the bridge. That work will require single-lane closures, and MDOT will make sure to remind motorists ahead of that work starting.
SAFETY BENEFITS:
This project will extend the life of the bridge and improve safety and ride quality for motorists.
TRAFFIC RESTRICTIONS:
Only one direction of traffic will be allowed through the work zone at a time and in two phases.
From Monday, Aug. 2, through Monday, Aug. 23, two lanes of westbound I-94 BL lanes will be open across the bridge, and eastbound I-94 BL will be detoured on Pitcher Street, Crosstown Parkway, and King Highway.
From Monday, Aug. 23, to Friday, Sept. 17, two lanes of eastbound I-94 BL will be open across the bridge, and westbound I-94 BL will be detoured on M-343 (Gull Road), Ransom Street, and Pitcher Street.
COUNTY:
Kalamazoo
HIGHWAY:
I-94 Business Loop (BL) (Michigan Avenue)
CLOSEST CITY:
Kalamazoo
START DATE:
Monday, Aug. 2, 2021
ESTIMATED END DATE:
Friday, Sept. 17, 2021
PROJECT:
The Michigan Department of Transportation (MDOT) will be repairing the I-94 BL bridge over Portage Creek. The $412,000 investment includes concrete end block replacement, deck patching, substructure repair, joint replacement, new guardrails, and approach work.
More on Michimich.com
- Anamorphic 3D Only Works on Fixed Screens. Loud! OOH Put It on a Moving Ad Van for Flood Re
- From DJ Booths to Disney: Orlando Author Ryan Tiffin Launches "Chasing Magic"
- FDA Food Recall Notices After Outbreak Linked to 98 Hospitalizations: Practical Tips for Safer Grocery Shopping
- The 'Tax Squeeze': Betsson's Record Quarter Previews the Economics of Finland's 2027 Casino Market
- ARGHouse and Plushy's Playground Announce Interactive Collaboration
Crews will return in late October to perform an epoxy overlay on the bridge. That work will require single-lane closures, and MDOT will make sure to remind motorists ahead of that work starting.
SAFETY BENEFITS:
This project will extend the life of the bridge and improve safety and ride quality for motorists.
TRAFFIC RESTRICTIONS:
Only one direction of traffic will be allowed through the work zone at a time and in two phases.
From Monday, Aug. 2, through Monday, Aug. 23, two lanes of westbound I-94 BL lanes will be open across the bridge, and eastbound I-94 BL will be detoured on Pitcher Street, Crosstown Parkway, and King Highway.
From Monday, Aug. 23, to Friday, Sept. 17, two lanes of eastbound I-94 BL will be open across the bridge, and westbound I-94 BL will be detoured on M-343 (Gull Road), Ransom Street, and Pitcher Street.
0 Comments
Latest on Michimich.com
- $40 Billion Global Market Value by 2030 Projected in Unmanned Aerial Vehicle or Other Drone Technology Sector, Growing at 9.2% Compound Annual Growth
- $620 Million in Recent Government Contract Awards with More Than $1.2 Billion in Annualized Revenue: Circle8 Group (N A S D A Q: CIRC)
- Lewis County Hydrogen Alliance Launches Phase 1 Work to Turn Forest Residuals into Fuel-Grade Hydrogen and Dispatchable Clean Power
- Next Gen Fibre Selects netElastic vBNG and CGNAT to Fuel Rapid Nationwide Expansion and Eliminate Network Bottlenecks
- Boston Industrial Solutions, Inc. Introduces SAP-G70 Primer for bonding silicone to silicone and other materials
- Michigan Birder Launches MichiganBirds.net, a Free Place to Share Bird Photos and Sightings
- 'Reflections: Enlightening Insights Into the Divine Mystery' — The Latest Book by Philosopher Steven Colborne
- Scott G. Hoy of Hoy Law Earns 11th Consecutive Super Lawyers Selection
- L2 Aviation Selected for U.S. Air Force KC-46 CASPER Multiple Award Contract
- Leeds Billboard Campaign Drives 188% Traffic Uplift as AI Enquiries Rise 266% for Loud! OOH
- Sister Files Lawsuit Against Georgia Funeral Home for Alleged Mishandling of Brother's Remains
- KeysCaribbean Resorts Offer Savings On Summer Vacations Now Through Aug. 31
- Crossroads4Hope Announces The Lipschutz Women's Fund
- AI, Drones, Defense & Explosive Growth: Why ZenaTech Is Emerging as One of the Most Compelling Technology Growth Stories (N A S D A Q: ZENA)
- 91 Per Cent of Enterprises Will Increase AI Spending. Most Can't See the Cost — or the Risk!
- New ProEssentials v11: Native WinUI Charting Library, 100M Points in 15ms, Following Microsoft's Vision for True Native Swap-Chain Rendering
- Salestrics Releases Version 2.0 to Unify CRM, Business Email, and Operations on a Single Customer Graph
- Aderra Opens in Magnolia, Texas, Offering a New Model for 62+ Homeownership
- What's New in Hokkaido, Autumn 2026
- Roofman USA Serving More of Michigan than Ever!