Trending...
- 'Public Speaking Without Panic' Launches to Help Leaders Speak with Confidence
- Digital Watchdog Launches New myDW Cloud Services
- Atlas Home Improvement Launches Annual Helmet for Heroes Giveaway on July 4, 2025
Contact: Diane Cross, MDOT Office of Communications, 313-375-2454Agency: Transportation
COUNTY:
Wayne
CITY:
Dearborn
ROADWAYS:
Miller Road
M-153 (Ford Road)
MILLER ROAD CLOSURE:
7 a.m.
Thursday, April 9, 2020
MILLER ROAD OPENING:
Mid-May 2020
PROJECT COMPLETION DATE:
Late August 2020
PROJECT DETAILS:
The Michigan Department of Transportation (MDOT) is investing $1.4 million to repair the Miller Road bridge over M-153. This project includes median pier replacement, structural steel repairs, railing replacement, epoxy overlay, painting of the steel bridge beams, and bridge approach reconstruction. This work requires closing Miller Road over M-153 along with lane closures on M-153. There will also be weekends where M-153 will be closed under Miller.
More on Michimich.com
Miller Road detour options:
Northbound Miller Road traffic can take:
- Eastbound US-12 (Michigan Avenue) to northbound Wyoming Avenue, then westbound Warren Road back to Miller Road, or
- Westbound US-12 to northbound Greenfield Road, then eastbound Warren Road back to Miller Road.
Southbound Miller Road traffic can take:
- Eastbound Warren Avenue to southbound Wyoming Road, then westbound US-12 back to Miller Road, or
- Westbound Warren Avenue to southbound Greenfield Road, then eastbound US-12 back to Miller Road.
Project map
SAFETY BENEFIT:
These bridge repairs will provide a smoother driving surface and will extend the life of the structure.
COUNTY:
Wayne
CITY:
Dearborn
ROADWAYS:
Miller Road
M-153 (Ford Road)
MILLER ROAD CLOSURE:
7 a.m.
Thursday, April 9, 2020
MILLER ROAD OPENING:
Mid-May 2020
PROJECT COMPLETION DATE:
Late August 2020
PROJECT DETAILS:
The Michigan Department of Transportation (MDOT) is investing $1.4 million to repair the Miller Road bridge over M-153. This project includes median pier replacement, structural steel repairs, railing replacement, epoxy overlay, painting of the steel bridge beams, and bridge approach reconstruction. This work requires closing Miller Road over M-153 along with lane closures on M-153. There will also be weekends where M-153 will be closed under Miller.
More on Michimich.com
- Deaths Spur Closures, but Troubled Teen Camps Must Be Banned, CCHR Warns
- Hillside Terrace Champions Lifelong Learning in Assisted Living
- Veteran Criminal Defense Attorney Offers Strategic DUI Defense and License Reinstatement
- Ann Arbor Criminal Defense Attorney Urges Residents to Be Informed During Police Encounters
- ArborMotion Highlights the Importance of Timely Brake Replacement for European Vehicles
Miller Road detour options:
Northbound Miller Road traffic can take:
- Eastbound US-12 (Michigan Avenue) to northbound Wyoming Avenue, then westbound Warren Road back to Miller Road, or
- Westbound US-12 to northbound Greenfield Road, then eastbound Warren Road back to Miller Road.
Southbound Miller Road traffic can take:
- Eastbound Warren Avenue to southbound Wyoming Road, then westbound US-12 back to Miller Road, or
- Westbound Warren Avenue to southbound Greenfield Road, then eastbound US-12 back to Miller Road.
Project map
SAFETY BENEFIT:
These bridge repairs will provide a smoother driving surface and will extend the life of the structure.
0 Comments
Latest on Michimich.com
- New Release: 'The Invisible Alternative' Unveiled by Atrisk Corporation, Resilient
- Cynthia Pinot Among Artists Selected for Renowned London Art Biennale 2025
- Real Estate Experts Highlight Jersey Shore as a Smart Buy in 2025
- Top 5 Mistakes Entrepreneurs Make When Applying for SBA Loans
- Michigan Computer Supplies Expands Reach into Livingston County with New Brighton Service Offerings
- $18 Price Target Issued in New Research Report After $34 Million Revenue Forecast from Acquisition; $101.5 Million Net Revenue in 2025; NAS DAQ: IQST
- West Dentistry Welcomes New Oral Surgeon to Enhance Patient Care
- Delta Industrial Provides Custom Flatwork for Factory Floors
- American Plastic Solutions Launches FAQ to Provide Tailored Plastic Fabrication Solutions
- AdviCoach of Southeast Michigan Helps Business Owners at Every Stage
- The AML Shop Launches New Financial Investigations Unit, Appoints Director to Lead the Initiative
- Raidium révolutionne le diagnostic de la Sclérose en Plaques en partenariat avec l'Hôpital Fondation Adolphe de Rothschild
- New Podcast "Spreading the Good BUZZ" Hosted by Josh and Heidi Case Launches July 7th with Explosive Global Reach and a Mission to Transform Lives
- The Herbal Care, Led by Markel Bababekov, Becomes a Top Dispensary in NYC's Upper East Side
- Digital Watchdog Launches New myDW Cloud Services
- Stan Fitzgerald Appointed Acting Press Secretary for Veterans for America First VFAF Georgia State Chapter
- Atlas Home Improvement Launches Annual Helmet for Heroes Giveaway on July 4, 2025
- Drone Light Shows Emerge as the New Standard in Live Event Entertainment
- Lore Link is Here to Help Organize Your Game
- Chappaqua's Annual Townwide Summer Sale – Unbeatable Savings at Your Favorite Local Boutiques!